Fabrication Follow-up

Focus Group offers fabrication follow-up services delivered by senior engineers with experience from projects around the world. These references have given us the necessary competence and understanding to operate and succeed in different cultures.

Apart from Europe, we have handled projects in Asia in general and China in particular as well as countries like South Korea, Malaysia, Indonesia, Singapore and Vietnam.

Focus Group supplies competence and experience within:

Site Admin/HSE

  • Site Management
  • HSE Inspections
  • QC Management
  • NDT Management
  • Welding Management
  • Planning
  • Responsible NDT Level 3
  • QA/QC Coordinator

Welding

  • Technical Auditor (NDT & Welding)
  • WPS, WPQ, pre-WPQRs
  • Welding Inspection/Supervision
  • PWHT (Post Weld Heat Treatment)

Fabrication

  • Checking of Material Certificates and Traceability
  • Structural Fabrication
  • Piping Fabrication and Installation
  • Pipe Support Fabrication and Installation
  • Equipment Installation

NDT/NDE

  • NDT Instructor
  • ET (Eddy Current Testing)
  • MT (Magnetic Particle Inspection)
  • PT (Dye Penetrant Inspection)
  • RT (Radiographic Inspection)
  • Radiographic Film Interpretation
  • VT (Visual Inspection)
  • UT (Ultrasonic Inspection)
  • HT (Hardness Testing)
  • PMI (Positive Material Identification)

Surface Treatment

  • Painting and Coating Inspection
  • Insulation Inspections

Testing

  • Pressure Testing
  • Hydrostatic Testing & Preservation
  • Load Testing
  • ITP Follow Up

Completion

  • MC (Mechanical Completion)
  • Commissioning
  • FAT (Fabrication Acceptance Test)
  • 3rd Party Verification
  • Grillage
  • Seafastening
  • Load Out/Load Out Management

«Through our extensive experience during many years at yards in Asia
and Europe, we know how to achieve the right quality on time.
We help our clients to succeed with their projects!»

Jens Arild Apland
CEO Focus Engineering, Qingdao China
Master in Offshore Construction

Do you need competent Fabrication follow-up?

Some of our Fabrication Follow-up Related References